SET-UP – 2ND SHIFT

Posted 1 month ago

HOURS:

  • 4, 10-hour shifts per week
  • 2nd shift: 3:30 pm – 2 am

DUTIES:

  • Takes directives from the Fabrication Supervisor to set up various metal fabrication machines with proper tooling to
    complete necessary job orders.
  • Maintains tooling in proper condition by cleaning, sorting, storing and examining for damage. Reworking as required, etc.
  • Forms initial “first part” after set up to ensure all tooling is properly installed and does Q.A. check to print.
  • Performs training of new employees on various machine operations and metal handling techniques .
  • Runs small parts orders as required.

PHYSICAL REQUIREMENTS:

  • Must be able to lift steel tooling and dies up to 35 lbs.; above the waist and position in presses.
  • Must be able to withdraw same tooling from storage racks and replace tooling into racks at various heights from floor.
  • Must be able to perform frequent bending, reaching, pushing and stretching. Many times with metal parts in hand.
  • Must be able to operate various machines by lifting and positioning repetitive parts up to 35 lbs.

EXCELLENT PAY AND BENEFITS INCLUDING:

  • Medical Insurance
  • Company Paid Dental Insurance
  • Company Paid Life Insurance
  • Company Paid STD Insurance
  • 401K with company match
  • Profit Sharing
  • 1 week of paid vacation after 6 months, and two weeks of paid vacation at 1 year
  • Shift premium of $1.50 for those working second shift

Apply Online

A valid phone number is required.
A valid email address is required.